Babbage Project Management stands at the forefront of the dairy, commercial, industrial and FMCG industries, delivering exceptional services through expertise, innovation, and seamless collaboration. We don’t just manage projects - we drive success, ensuring every phase runs smoothly while maximising efficiency and results for our clients.
We provide true leadership across all project stages - development, design, procurement, and delivery - ensuring every project meets client expectations with precision and efficiency. Serving multiple sectors, we deliver tailored solutions that drive success.
Since 1992, we've built a trusted reputation in the dairy and food sector, managing over $4.9B in projects - representing 90% of the industry's total capital investment. With more than 25 dairy and food processing plants completed, including critical infrastructure such as process buildings, offices, staff amenities, and warehousing, our expertise runs deep.
Our senior team brings 150+ years of combined experience, ensuring a sharp understanding of sector demands. Beyond construction, we play a key role in pre-project planning, assisting with scoping and resource consenting for new ventures valued at over $700M. With 5 million man-hours managed in dairy processing facilities, we ensure smooth operations - free from industrial relations issues.

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)

Babbage managed the development of a second cheese plant at Stanhope, including supporting infrastructure (Client: Fonterra)

Nutritional dairy dryer, blending and canning factory in Gore (Client: Mataura Valley Milk)

Building another spray dryer factory - loading in the baghouse

An aerial photo of the site layout of a greenfield development at Glenavy (Client: Oceania Dairy Limited)

Babbage managed the two new dryers and butter plant with all the supporting infrastructure, Te Awamutu (Client: Fonterra)

The Stage II Foods Plant palletisation area under construction (Client: The Tatua Cooperative Dairy Company)

Greenfield Site Development at Glenavy. Client: Oceania Dairy Limited

A greenfield site development at Glenavy (Client: Oceania Dairy Limited)

A greenfield site development at Tokoroa with the biomass boiler construction nearing completion (Client: OFI)

Clandeboye site development where Babbage managed dryers 2 and 3 with all the supporting infrastructure (Client: Fonterra)
What our Customers Say
“Babbage has provided an integrated approach beginning with the development of solutions to meet business case budgets and requirements, successful management of the tendering process and the appointment and supervision of contractors to achieve our project outcomes. They bring a proven health and safety management track record and well-developed cost management processes which provided rigorous control and reporting of cost throughout the projects. We have always found Babbage personnel to be helpful, reliable, and professional in their approach and we look forward to working with Babbage on future developments.”
Synlait Milk Limited
Fonterra
What our Customers Say
“Babbage has provided an integrated approach beginning with the development of solutions to meet business case budgets and requirements, successful management of the tendering process and the appointment and supervision of contractors to achieve our project outcomes. They bring a proven health and safety management track record and well-developed cost management processes which provided rigorous control and reporting of cost throughout the projects. We have always found Babbage personnel to be helpful, reliable, and professional in their approach and we look forward to working with Babbage on future developments.”
Synlait Milk Limited
Fonterra
What our Customers Say
“Babbage has provided an integrated approach beginning with the development of solutions to meet business case budgets and requirements, successful management of the tendering process and the appointment and supervision of contractors to achieve our project outcomes. They bring a proven health and safety management track record and well-developed cost management processes which provided rigorous control and reporting of cost throughout the projects. We have always found Babbage personnel to be helpful, reliable, and professional in their approach and we look forward to working with Babbage on future developments.”
Synlait Milk Limited
Fonterra
Project Management Services
Project Management Services
Feasibility studies and master planning
Feasibility studies and master planning
Feasibility studies and master planning
Budget estimation
Budget estimation
Budget estimation
Design management
Design management
Design management
Health and Safety management
Health and Safety management
Health and Safety management
Construction management
Construction management
Construction management
Contract management and administration
Contract management and administration
Contract management and administration
Timeline management
Timeline management
Timeline management
Cost management and reporting
Cost management and reporting
Cost management and reporting
Quality management
Quality management
Quality management
Key Contacts
Contact Us
Contact Us


What we do
What we do
What we do