Te Atatu Peninsula Stormwater Network Project

This project entails field investigation and design of the stormwater network to facilitate growth in Te Atatu, meet the level of service requirements and alleviate flooding from excessive overland flows.

This project entails field investigation and design of the stormwater network to facilitate growth in Te Atatu, meet the level of service requirements and alleviate flooding from excessive overland flows.

This project entails field investigation and design of the stormwater network to facilitate growth in Te Atatu, meet the level of service requirements and alleviate flooding from excessive overland flows.

Client

Auckland Council

Client

Auckland Council

Client

Auckland Council

Location

Te Atatu,

Auckland

Location

Te Atatu,

Auckland

Location

Te Atatu,

Auckland

Cost

Confidential

Cost

Confidential

Cost

Confidential

Completion

Ongoing

Completion

Ongoing

Completion

Ongoing

Market

Local and Central Government

Market

Local and Central Government

Market

Local and Central Government

Disciplines

Disciplines

This project for Auckland Council Healthy Waters team has a capital value of $45M, and includes over 6km of stormwater pipelines ranging from 300-2,000mm in diameter, groundwater reaching soakpits, stream restoration and stream reclamation.

Babbage has offered field investigations, ecology, freshwater, coastal and benthic environments assessments, and assessment of outfall options.

Challenges

Challenging sea conditions to undertake field investigations. Diverse terrain with fluctuating ground levels necessitated careful pipe alignment to minimise earthworks. Vertical alignment posed a risk of negative pressure, requiring measures to ensure structural integrity.