Te Aroha Wastewater Treatment Plant Inlet Headworks

The Matamata-Piako District Council engaged Babbage to replace the current wastewater drum screens with a higher capacity drum screen and grit removal upstream of the membrane bioreactor.

The Matamata-Piako District Council engaged Babbage to replace the current wastewater drum screens with a higher capacity drum screen and grit removal upstream of the membrane bioreactor.

The Matamata-Piako District Council engaged Babbage to replace the current wastewater drum screens with a higher capacity drum screen and grit removal upstream of the membrane bioreactor.

Client

Matamata-Piako District Council

Client

Matamata-Piako District Council

Client

Matamata-Piako District Council

Location

Te Aroha,

Waikato

Location

Te Aroha,

Waikato

Location

Te Aroha,

Waikato

Cost

Confidential

Cost

Confidential

Cost

Confidential

Completion

Ongoing

Completion

Ongoing

Completion

Ongoing

Market

Local and Central Government

Market

Local and Central Government

Market

Local and Central Government

Disciplines

Disciplines

Babbage undertook the works in two stages. In the first stage Babbage completed an options assessment to consider how the screens can be orientated and fit into the existing space. The second stage included preparing a specimen design and tender documents for a Design and Construct Contract.  Babbage formed part of the Tender Evaluation Team.

Challenges

The challenge was to fit the largest capacity screen on the existing structure to eliminate civil works. This required a detailed survey of the plant and working with suppliers to fit a drum screen in the constrained space. Sequencing of the works to ensure that the plant downtime was minimised to ensure the plant remained compliant.